Energy Performance Systems, Inc.

7767 Elm Creek Boulevard
Maple Grove, MN 55369

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $835K
First Award Date 01/01/01
Most Recent Award Date 01/01/02

Key Personnel

Last Name Name Awards Contact
Ostile L. David Ostile 3 Message

3 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 2002
Budget: 01/01/02 - 12/31/02

65799 A whole-tree harvesting system would significantly reduce the cost of cutting, loading, and handling farm-grown hybrid trees for use in the biomass energy production industry. This project will construct, test, and document a full scale, operational, whole-tree harvester. In Phase I, the automatic control system was designed, tested, a...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2002
Budget: 01/01/02 - 12/31/02

65799 A whole-tree harvesting system would significantly reduce the cost of cutting, loading, and handling farm-grown hybrid trees for use in the biomass energy production industry. This project will construct, test, and document a full scale, operational, whole-tree harvester. In Phase I, the automatic control system was designed, tested, a...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

65799 A whole-tree harvesting system would significantly reduce the cost of cutting, loading, and handling farm-grown hybrid trees for use in the biomass energy production industry. To continue progress in the development of the whole-tree harvester, this project will develop automatic controls for the steering and tree accumulator systems. ...