Value Recovery, Inc.

510 Heron Drive, Suite 301
Bridgeport, NJ 08014

SBIR Award Summary

Total Number of Awards 6
Total Value of Awards $1.65MM
First Award Date 01/01/00
Most Recent Award Date 01/01/05

Key Personnel

Last Name Name Awards Contact
Halpern Marc Halpern 2
Joyce Peter J. Joyce 6 Message

6 Awards Won

Phase 1 SBIR

Agency: Department of Agriculture
Topic: 2005
Budget: 01/01/05 - 12/31/05

Methyl bromide, an effective soil fumigant, has been identified as one of the worst depleters of the ozone layer. Methyl bromides strong suit, its reactivity, is also its Achilles heel. Over 80% of methyl bromide used in 1990 was used for soil fumigation and this application has been targeted directly for elimination. Consequently, the Montreal ...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2002
Budget: 01/01/02 - 12/31/02

65666 The recovery of chemical byproducts from aqueous streams requires huge capital investments that can exceed $2.5 million per installation, even for small streams up to ~500,000 lbs/yr, typical of small to intermediate chemical manufacturing. These costs are driven by the need to use inefficient conventional chemical reactors and the...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2002
Budget: 01/01/02 - 12/31/02

65666 The recovery of chemical byproducts from aqueous streams requires huge capital investments that can exceed $2.5 million per installation, even for small streams up to ~500,000 lbs/yr, typical of small to intermediate chemical manufacturing. These costs are driven by the need to use inefficient conventional chemical reactors and the...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

65666 The recovery of chemical byproducts from aqueous streams requires huge capital investments that can exceed $2.5 million per installation, even for streams with only ~500,000 lbs/yr, typical of small to intermediate chemical manufacturing. These costs are driven by the need to use inefficient conventional chemical reactors and the ne...

Unknown

Not Available

Phase 1 SBIR

Agency: Department of Energy
Topic: 2000
Budget: 01/01/00 - 12/31/00

Phase 2 SBIR

Agency: Department of Energy
Topic: 2000
Budget: 01/01/00 - 12/31/00