Zmation, Inc.

14811 N.E. Airport Way, Suite 200
Portland, OR 97230

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $530K
First Award Date 01/01/00
Most Recent Award Date 01/01/02

Key Personnel

Last Name Name Awards Contact
Lee John J. Lee 4 Message
Howard Craig D. Howard 3 Message
Gebers Curtis A. Gebers 1 Message

4 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 2002
Budget: 01/01/02 - 12/31/02

70762 The Next Linear Collider will require approximately 9000 accelerator structures or stacks of 207 different but very similar looking parts or cells. These ultra precision, soft, flat copper cells require automated assembly due to the stack dimensions and tolerances, the potential for damage or miss-sequencing during handling, an...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

60293 Accelerator cells for the Next Linear Collider come in families of 200 different, but similar looking parts with tolerances varying from.5 to 50 microns. A total of 2,000,000 cells or 10,000 of each type need to be manufactured. Speed and repeatability associated with automated part handling is essential, and the automated roboti...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

60293 Accelerator cells for the Next Linear Collider come in families of 200 different, but similar looking parts with tolerances varying from.5 to 50 microns. A total of 2,000,000 cells or 10,000 of each type need to be manufactured. Speed and repeatability associated with automated part handling is essential, and the automated roboti...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2000
Budget: 01/01/00 - 12/31/00