Remotec Inc.

114 Union Valley Rd
Oak Ridge, TN 37830

SBIR Award Summary

Total Number of Awards 11
Total Value of Awards $2.21MM
First Award Date 01/01/84
Most Recent Award Date 01/01/93

Key Personnel

Last Name Name Awards Contact
white John r. white 11
Harvey Mr. Howard W. Harvey 2

11 Awards Won

Phase 2 SBIR

Agency: Department of Energy
Topic: 1993
Budget: 01/01/93 - 12/31/93

THIS PROJECT INVOLVES THE DEVELOPMENT OF A MOBILE ROBOT SYSTEM THAT CAN WITHSTAND VERY HIGH LEVELS OF RADIATION AND VERY HIGH TEMPERATURES. ALTHOUGH MANY ROBOT SYSTEMS ARE PRESENTLY AVAILABLE, NONE CAN OPERATE IN THIS EXTREME ENVIRONMENT, AS WAS DRAMATICALLY EVIDENCED DURING THE RECOVERY ACTIVITIES AT THE CHERNOBYL SITE. THE PRIMARY FOCUS OF THI...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1992
Budget: 01/01/92 - 12/31/92

Phase 2 SBIR

Agency: Department of Energy
Topic: 1990
Budget: 01/01/90 - 12/31/90

DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) ON THE ARGONNE-WEST SITE IN IDAHO. TEST RESULTS WILL BE INCORPORATED INTO THE DESIGN OF A COMMERCIAL IFR FUEL CYCLE FACILITY. THIS PROJECT CONTRIBUT...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1989
Budget: 01/01/89 - 12/31/89

Phase 2 SBIR

Agency: Department of Energy
Topic: 1988
Budget: 01/01/88 - 12/31/88

THE SPECIALIZED CONFIGURATION OF THE CTT (COMPACT IGNITION TOKAMAK) PLASMA CHAMBER WITH ITS LIMITED ACCESS SPACE, HIGH RADIATION LEVELS, AND HIGH VACUUM CONDITIONS REQUIRES THE DEVELOPMENT OF SPECIAL PURPOSE REMOTE-HANDLING EQUIPMENT. INITIAL ASSEMBLY OF THE VACUUM VESSEL AND PORT PLUS IN-VESSEL INSPECTION/MAINTENANCE OF FIRST-WALL COMPONENTS, D...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1987
Budget: 01/01/87 - 12/31/87

Phase 2 SBIR

Agency: Department of Energy
Topic: 1986
Budget: 01/01/86 - 12/31/86

A ROBOTIC INSPECTION SYSTEM WILL BE DEVELOPED TO ELIMINATE THE NEED FOR WORKER ENTRY INTO REACTOR CAVITIES AT PRESSURIZED WATER REACTOR (PWR) PLANTS. CURRENTLY, WORKERS MUST ENTER THE CAVITY TO LOOK FOR WATER LEAKS FROM THE REFUELING CAVITY DURING EACH REFUELING OUTAGE. THESE ENTRIES ARE A MAJOR CONCERN TO THE NRC AND PLANT OPERATORS BECAUSE OF ...

Phase 2 SBIR

Agency: Department of Energy
Topic: 1986
Budget: 01/01/86 - 12/31/86

ALL FUSION MACHINE CONCEPTS HAVE ADOPTED A MAINTENANCE PHILOSOPHY FOR REMOVING AND REPLACING OF FAILED COMPONENTS IN ORDER TO MINIMIZE MACHINE DOWNTIME FOR REPAIR. MANY COMPONENTS ARE CONNECTED TO THE MACHINE BY LARGE BOLTED FLANGES. THE UNBOLTING AND BOLTING OPERATIONS ARE TO BER PERFORMED BY WORKERS WEARING PROTECTIVE CLOTHING WITH AIR-SUPLIED...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1985
Budget: 01/01/85 - 12/31/85

Phase 1 SBIR

Agency: Department of Energy
Topic: 1985
Budget: 01/01/85 - 12/31/85

Load More