Facility & Manufacturing

795 Oak Ridge Turnpike
Oak Ridge, TN 37830

SBIR Award Summary

Total Number of Awards 1
Total Value of Awards $50K
First Award Date 01/01/83
Most Recent Award Date 01/01/83

Key Personnel

Last Name Name Awards Contact
Toscano Dr. William M. Toscano 1

1 Award Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 1983
Budget: 01/01/83 - 12/31/83

THE MAJOR LIMITING RELIABILITY COMPONENT OF CRYOGENIC SYSTEMS HAS ALWAYS BEEN SEALS. BESIDES CONTRIBUTING TO GAS CONTAMINATION AND DEBRIS PARTICLE ACCUMULATION, SEALS HAVE PHYSICALLY FAILED; AS A RESULT, SEALS HAVE BEEN RESPONSIBLE FOR THE MAJORITY OF FAILURES OCCURRING IN CRYOGENIC LIQUIFICATION AND REFRIGERATION SYSTEMS. A POTENTIALLY VIABLE S...