Global Aerospace Corporation

12981 Ramona Blvd., Suite E
Irwindale , CA 91706

SBIR Award Summary

Total Number of Awards 11
Total Value of Awards $1.9MM
First Award Date 01/01/99
Most Recent Award Date 06/10/16

Key Personnel

Last Name Name Awards Contact
Heun Matthew K. Heun 5 Message
Burger Dale R. Burger 1 Message
Nock Kerry T. Nock 4 Message
Baker Keith Baker 4 Message
Penzo Paul A. Penzo 1 Message
Medlock Kristin G. Medlock 1 Message
Pankine Alexey A. Pankine 1 Message
Goldman Benjamin D Goldman 1 Message

11 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: S3.06
Budget: 06/10/16 - 12/09/16

Your mission is to explore the atmosphere and surface of Saturn's moon, Titan, a cold, harsh environment that poses many technical challenges for any potential exploration platform. Imagine an inflatable, flying wing-glider that could enter Titan?s atmosphere from orbit, execute controlled movements in atmospheric flight, and descend to the surf...

Phase 1 STTR

Institution: Cal Poly Corporation

Agency: National Aeronautics and Space Administration
Topic: 10-1-T1.01
Budget: 01/01/11 - 12/31/11

Global Aerospace Corporation (GAC), and its research partner, Cal Poly San Luis Obispo (CPSLO), will develop an integrated Small Probe Reentry System (SPRS) for low Earth orbit (LEO) small satellite Earth reentry missions. The SPRS delivers the small probe to a targeted reentry, protects it from the harsh atmospheric reentry environment, slows i...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 09-1
Budget: 01/01/09 - 12/31/09

Global Aerospace Corporation proposes to develop a hypersonic control modeling and simulation tool for hypersonic aeroassist vehicles. Our control and simulation testbed will be focused on the particularly important problem of a lifting, towed ballute for planetary aerocapture. The importance of this technology innovation is in the understandin...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 2006
Budget: 01/01/06 - 12/31/06

This Small Business Innovation Research Phase I project will provide low-cost atmospheric temperature measurements from the surface to the lower stratosphere with sufficient accuracy for climatological science. Feasibility will be determined by two factors: the magnitude of the potential accuracy improvements of the proposed innovation compared ...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 04-1
Budget: 01/01/04 - 12/31/04

We propose to develop an innovative, versatile and extensible, continuous-thrust trajectory optimization tool for planetary mission design and optimization of continuous-thrust spacecraft missions. A working title for this new tool is ?Apache.? Apache will be a platform-independent and user-friendly tool that eliminates piecewise optimization. A...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 02-2
Budget: 01/01/02 - 12/31/02

Global Aerospace Corporation is developing an innovative, new trajectory and performance tool for Earth and planetary balloons and lighter-than-air (LTA) systems, called Navajo. No software tool like Navajo currently exists. The key innovations of this concept are integrated vertical and horizontal trajectory modeling, application to Earth and p...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 02-1
Budget: 01/01/02 - 12/31/02

Global Aerospace Corporation is developing an innovative, new trajectory and performance tool for Earth and planetary balloons and lighter-than-air (LTA) systems, called Navajo. No software tool like Navajo currently exists. The key innovations of this concept are integrated vertical and horizontal trajectory modeling, application to Earth and p...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 00-2
Budget: 01/01/00 - 12/31/00

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 00-1
Budget: 01/01/00 - 12/31/00

Unknown

Not Available

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 00-1
Budget: 01/01/00 - 12/31/00

Load More