GSSL Inc

PO Box 909
Tillamook, OR 97141

SBIR Award Summary

Total Number of Awards 12
Total Value of Awards $2.71MM
First Award Date 01/01/98
Most Recent Award Date 01/01/12

Key Personnel

Last Name Name Awards Contact
Lachenmeier Tim Lachenmeier 3 Message
Lachenmeier Timothy T. Lachenmeier 3 Message
Lachenmeier Kristen S. Lachenmeier 4 Message
Murai Koh Murai 4 Message
Lachenmeier T.t. Lachenmeier 2 Message

12 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 10-2-S3.07
Budget: 01/01/12 - 12/31/12

With the Titan Saturn System Mission, NASA is proposing to send a Montgolfiere balloon to probe the atmosphere of Titan. To better plan this mission and create a robust optimized balloon design, NASA requires the ability to more accurately evaluate the convective heat transfer characteristics of the balloon operating in Titan's atmosphere. Bas...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 10-1-S3.07
Budget: 01/01/11 - 12/31/11

With the Titan Saturn System Mission, NASA is proposing to send a Montgolfiere balloon to probe the atmosphere of Titan. In order to better plan this mission and create a robust optimized balloon design, NASA requires the ability to more accurately evaluate the convective heat transfer characteristics of the balloon operating in Titan's atmosph...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 05-1
Budget: 01/01/05 - 12/31/05

The proposed innovation involves the concept of using a Superpressure Tow Balloon (STB) with existing NASA high altitude balloon designs to form a tandem balloon system that provides significantly higher performance at a relatively low cost. Performance improvements include: longer durations, higher altitudes and greater stability, larger paylo...

Phase 1 SBIR

Agency: Department of Commerce
Topic: 2004
Budget: 01/01/04 - 12/31/04
PI: Koh Murai

Current turbulence measurements are limited to pilot reports and measurements along a specific vertical or horizontal trajectory. Aside from the high cost, these methods do not provide information on turbulence patches, their size or persistence. This proposal combines emerging sensor instrumentation with new balloon technology to produce a ba...

Phase 2 SBIR

Agency: Department of Commerce
Topic: 2002
Budget: 01/01/02 - 12/31/02
PI: Koh Murai

In-situ measurement of meteorological, atmospheric chemistry, and oceanic parameters for regional models would aid greatly in the understanding of critical processes and provide the necessary data for national policy decisions on significant environmental issues. three Dimensional Reinforced (3DR) membranes have the ability to offer a dramatic r...

Phase 1 SBIR

Agency: Department of Commerce
Topic: 2002
Budget: 01/01/02 - 12/31/02
PI: Koh Murai

In-situ measurement of meteorological, atmospheric chemistry, and oceanic parameters for regional models would aid greatly in the understanding of critical processes and provide the necessary data for national policy decisions on significant environmental issues. three Dimensional Reinforced (3DR) membranes have the ability to offer a dramatic r...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 01-1
Budget: 01/01/01 - 12/31/01

NASA's Ultra Long Duration Balloon and Aerobot programs are seeking innovative and cost effective solutions to provide: high strength to weight composite envelope materials; efficient cost-effective seaming and fabrication techniques; deployment and inflation of balloon envelopes in planetary atmospheres; and innovative balloon design concepts. ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 01-2
Budget: 01/01/01 - 12/31/01

NASA's Ultra Long Duration Balloon and Aerobot programs are seeking innovative and cost effective solutions to provide: high strength to weight composite envelope materials; efficient cost-effective seaming and fabrication techniques; deployment and inflation of balloon envelopes in planetary atmospheres; and innovative balloon design concepts. ...

Phase 1 SBIR

Agency: Department of Commerce
Topic: 2001
Budget: 01/01/01 - 12/31/01
PI: Koh Murai

$69.9K

Not Available

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 00-1
Budget: 01/01/00 - 12/31/00

Load More