Cirrus Design

Duluth Intl Airport, 4515, Taylor Circle
Duluth, MN 55811

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $1.34MM
First Award Date 01/01/94
Most Recent Award Date 01/01/95

Key Personnel

Last Name Name Awards Contact
Grand Robert Grand 2
Laffen John Laffen 2

4 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 95-2
Budget: 01/01/95 - 12/31/95

Cirrus Design proposes the development of a low cost, electromagnetic-type deice system that is integrable with Natural Laminar Flow (NLF) airfoils, on General Aviation (GA) aircraft. To compete with alternate modes of travel like the interstate highway system and airlines, GA aircraft must provide transportation that is fast, economical, safe, ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 95-2
Budget: 01/01/95 - 12/31/95

General aviation aircraft sales reached 18,000 new aircraft per year in the late 1970's before dropping off to what it is today. The need for personal aviation transportation is still prevalent, and small single engine aircraft that are produced using low cost manufacturing techniques can provide the performance and safety needed to make general...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 94-1
Budget: 01/01/94 - 12/31/94

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 94-1
Budget: 01/01/94 - 12/31/94