Renaissance Services

1825 Corporate Center Blvd
Fairborn, OH 45324
http://www.ren-services.com
10 Employees

SBIR Award Summary

Total Number of Awards 12
Total Value of Awards $2.34MM
First Award Date 01/01/94
Most Recent Award Date 09/30/15

Key Personnel

Last Name Name Awards Contact
Morris Mr. Robert E. Morris 1 Message
Sokol Mr. Dan Z. Sokol 10 Message
Sokol DZ Sokol 1 Message

12 Awards Won

Phase 1 SBIR

Agency: Defense Logistics Agency
Topic: DLA152-003
Budget: 09/30/15 - 09/29/16
PI: DZ Sokol

This Phase I SBIR project demonstrates how ?CAD as tooling,? coupled with additive manufacturing, will ultimately prove the viability of ?on-demand? ceramic process aids for all legacy turbine airfoil investment castings. This in turn, will reduce the leadtime for ceramic process aids by 95% and save up to $750,000 per casting part number in to...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA04-035
Budget: 09/19/05 - 11/13/08

The integration of design intent with process capability is fundamental to mission assurance. The inability to achieve such reconciliation during product development results in protracted production transition and costly quality escapes. The project team led by Renaissance Services defined a digital solution for bringing intelligence to the d...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA04-111
Budget: 03/03/05 - 09/03/05

By necessity, the Missile Defense Agency (MDA) has uncompromising affordability and mission assurance objectives. To achieve these objectives, MDA leverages the full capability of the industrial base for materials, components, and subsystems. Sometimes this entails seeking alternative materials, processes, and components that provide better, mo...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA04-035
Budget: 05/06/04 - 11/06/04

Integration of design intent with process capability is fundamental to mission assurance. Inability to achieve such integration during product development means costly and protracted production transition, quality escapes, even system failures. This proposal addresses feasibility of a system for real-time, quantitative information, linking des...

Phase 2 SBIR

Agency: National Science Foundation
Topic: 2000
Budget: 01/01/00 - 12/31/00

Unknown

Not Available

Phase 1 SBIR

Agency: National Science Foundation
Topic: 2000
Budget: 01/01/00 - 12/31/00

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1999
Budget: 01/01/99 - 12/31/99

Phase 2 SBIR

Agency: Department of Commerce
Topic: 1998
Budget: 01/01/98 - 12/31/98

While much of the data involved in product and order definition has been captured in standard electronic structures such as IGES and EDI, material and process specifications are still handled as amorphous, paper-based documents. The use of manual, text-based specifications is an extremely labor-intensive and time-consuming process. Specification...

Phase 1 SBIR

Agency: Department of Commerce
Topic: 1997
Budget: 01/01/97 - 12/31/97

While much of the data involved in product and order definition has been captured in standard electronic structures such as IGES and EDI, material and process specifications are still handled as amorphous, paper-based documents. The use of manual, text-based specifications is an extremely labor-intensive and time-consuming process. Specification...

Phase 2 SBIR

Agency: National Science Foundation
Topic: 1995
Budget: 01/01/95 - 12/31/95

THE AMERICAN MATERIALS INDUSTRY PROVIDES SOURCE MATERIAL FOR ALL TIERS OF THE INDUSTRIAL BASE, INCLUDING AIRCRAFT ENGINES, SPORTING GOODS, AND AUTOMOBILES. A MAJOR DIFFERENCE BETWEEN MATERIAL SUPPLIERS AND DISCRETE MANUFACTURERS IS THAT MOST COMPONENT AND FINAL PRODUCT MANUFACTURERS DOCUMENT AND COMMUNICATE THEIR PRODUCT DESIGNS USING DRAWINGS ...

Load More