Engineering Systems Simulation

12914 Wolverton Ln
Cerritos, CA 90701

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $548K
First Award Date 01/01/91
Most Recent Award Date 01/01/92

Key Personnel

Last Name Name Awards Contact

2 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 92-2
Budget: 01/01/92 - 12/31/92
PI: Unavailable

PREDICTING THE PERFORMANCE OF A HYPERSONIC AERO-SPACECRAFT SUCH AS THE NATIONAL AERO-SPACE PLANE (NASP) IS DIFFICULT BECAUSE OF CURRENT TECHNOLOGICAL LIMITATIONS. WIND TUNNELS TO RUN HIGH MACH FLIGHTS TO GET DATA ON AIRFLOW, ROLL RATE, AND SHOCK STRUCTURES ARE NOT AVAILABLE. NUMERICAL SIMULATION BASED ON THE FINITE-ELEMENT SOLUTION TECHNIQUE OFF...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable