Pacific Monolothics Inc

245 Santa Ana Ct
Sunnyvale, CA 94086

SBIR Award Summary

Total Number of Awards 4
Total Value of Awards $644K
First Award Date 01/01/89
Most Recent Award Date 01/01/91

Key Personnel

Last Name Name Awards Contact
Maccabe Stephen P Maccabe 2
Bettner Allen W Bettner 1

4 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

HIGH-SPEED, DIGITAL-SIGNAL PROCESSING AND DETECTION TECHNIQUES TO DOWNCONVERT AND PROCESS KA-KU-X AND S-BAND SIGNALS ARE NEEDED. A GAAS INTEGRATED-CIRCUIT VERSION OF A SAMPLING MIXER WILL BE INVESTIGATED FOR THIS PURPOSE. A CIRCUIT CONFIGURATION WILL BE DEFINED FOR S-AND X-BAND CHIPS, AND SPECIFICATIONS NECESSARY FOR THE DEVELOPMENT OF THE CHIP ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-2
Budget: 01/01/90 - 12/31/90

THERE IS A REQUIREMENT FOR LARGE - DEVIATION, LINEAR PHASE SHIFTER CIRCUITS WITH QPSK AND BPSK CAPABILITY ON-BOARD FOR USE IN NEW SPACECRAFT COMMUNICATION SYSTEMS. A GALLIUM ARSENIDE INTEGRATED CIRCUIT WILL BE STUDIED FOR THIS PURPOSE. A CIRCUIT CONFIGURATION WILL BE DEFINED FOR AN X-BAND CHIP, AND SUPPORTING CIRCUITRY, AND SPECIFICATIONS NECESS...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1989
Budget: 01/01/89 - 12/31/89

TRENDS IN COMPUTING TODAY RELY HEAVILY ON PARALLEL PROCESSING IN SOLVING COMPLEX FIELD MODELING PROBLEMS. BECAUSE OF INTERPROCESSOR COMMUNICATION PROBLEMS, HOWEVER, THE ULTIMATE SPEED AT WHICH PROBLEMS CAN BE SOLVED IS LIMITED. MULTIV AVOIDS THIS DILEMMA BY EMPLOYING AN OLD YETPOTENTIALLY MASSIVELY PARALLEL TECHNIQUE, NAMELY THE RANDOM WALK METH...