Expert-ease Systems

1301 Shoreway Rd #420
Belmont, CA 94002

SBIR Award Summary

Total Number of Awards 15
Total Value of Awards $2.89MM
First Award Date 01/01/85
Most Recent Award Date 01/01/89

Key Personnel

Last Name Name Awards Contact
Frogner Bjorn Frogner 6
Holzer Joseph M. Holzer 5
larson Robert e. larson 2
O'reilly Dr. John O'reilly 1
Engle Mr. Steve Engle 1

15 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89

THIS PROPOSAL ADDRESSES THE DESIGN, DEVELOPMENT, AND IMPLEMENTATION OF MATHCOMMAND, A SET OF SYSTEMS SOFTWARE ROUTINES TO AID THE EFFICIENT EXECUTION OF LARGE-SCALE SCIENTIFIC AND ENGINEERING COMPUTATIONS ON PARALLEL COMPUTERS. THE GOAL OF THIS PROJECT IS TO DETERMINE METHODS OF MAKING THE RAW COMPUTING POWER OF PARALLEL COMPUTERS AVAILABLE TO P...

Phase 2 SBIR

Agency: Department of Energy
Topic: 1988
Budget: 01/01/88 - 12/31/88

THIS PROJECT WILL FOCUS ON IMPROVING NUCLEAR POWER PLANT AVAILABILITY BY EMPLOYING AN EXPERT SYSTEM-BASED OPERATOR DECISION AID TO PROVIDE GUIDANCE TO THE OPERATION AND MAINTENANCE OF THE PLANT SO THAT BOTH THE INDIVIDUAL COMPONENTS AND THE PLANT REMAIN IN THE REGIME OF SAFE OPERATION TO MINIMIZE INADVERTENT TRIPS. THE PRIMARY FOCUS IS TO DEVELO...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-2
Budget: 01/01/88 - 12/31/88
PI: Unavailable

THIS PROPOSAL ADDRESSES THE DEVELOPMENT OF A FAMILY OF MULTI-MICROPROCESSOR COMPUTERS. THESE COMPUTERS WILL YIELD SUPERCOMPUTER PERFORMANCE, BUT AT A MUCH LOWER COST AND WITH GREATER USABILITY. THE PROPOSAL IS BASED UPON DERIVINGA FAMILY OF "CHORDAL RING" COMPUTER ARCHITECTURES. THESE ARCHITECTURES ARE SUPERIOR TO THOSE USED IN OTHER COMMERCIALL...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-2
Budget: 01/01/88 - 12/31/88
PI: Unavailable

THE OBJECTIVE OF THIS PROPOSAL IS TO DEVELOP AN EXPERT FLIGHT SYSTEM MONITOR (EFSM) FOR AIRCRAFT APPLICATIONS USING AN EXPERT SYSTEM TOOL. THE EFSM WILL MONITOR THE STATUS OF THE FLIGHT AND MISSION CRITICAL FUNCTIONS AND PROPOSE RECOVERY PROCEDURES (I.E., SUCCESS PATHS) THAT THE FLIGHT CREW CAN IMPLEMENT. AN APPROACH BASED ON MONITORING CRITICAL...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1987
Budget: 01/01/87 - 12/31/87

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-1
Budget: 01/01/87 - 12/31/87
PI: Unavailable

Phase 1 SBIR

Agency: Department of Energy
Topic: 1987
Budget: 01/01/87 - 12/31/87

THE DEVELOPMENT OF A VISION-AUGMENTED CONTROL SYSTEM FOR ROBOTIC MANIPULATORS IS PLANNED. THE SYSTEM EMPLOYS A NOVELSTRUCTURE, WHICH PLACES THE VISION SYSTEM CAMERA ON ITS OWN MANIPULATOR ARM, ALLOWING THE CAMERA TO SEEK POSITIONS OF OPTIMAL VISIBILITY FOR CONTROL OF COARSE-TO-INTERMEDIATE MANIPULATOR MOVEMENTS. FURTHERMORE, IT PERMITS THE CAMER...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-1
Budget: 01/01/87 - 12/31/87
PI: Unavailable

ESTABLISHING THE OVERALL SAFETY OF COMPLEX SYSTEMS COMPOSED OF HARDWARE AND IMBEDDED SOFTWARE AND VALIDATING THE CORRECTNESS OF THEIR ACTIVE COMPUTER CONTROL IS A PARTICULARLY DIFFICULT AND CUMBERSOME TASK THAT ACUTELY STRAINS CURRENT METHODOLOGIES. THE CURRENT METHODS ARE SEVERELY LIMITED WHEN APPLIED TO SYSTEMS CONTAINING LOOPS AND INTERCONNEC...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-1
Budget: 01/01/87 - 12/31/87
PI: Unavailable

Phase 1 SBIR

Agency: Department of Energy
Topic: 1987
Budget: 01/01/87 - 12/31/87

THIS PROJECT WILL MERGE METHODS DERIVED FROM ARTIFICIAL INTELLIGENCE TECHNOLOGY WITH CONVENTIONAL ANALYTIC REDUNDANCY METHODS, THE OBJECTIVE BEING TO OBTAIN IN REAL-TIME HIGHLY SENSITIVE AND COST-EFFECTIVE IDENTIFICATIONOF DEGRADATION IN POWERPLANT INSTRUMENTATION. THE RESEARCH WILL START WITH THE EXPERIENCE THAT IS AVAILABLE IN THE USE OF SIMUL...