Omitron Inc.

6305 Ivy Ln #500
Greenbelt, MD 20770

SBIR Award Summary

Total Number of Awards 9
Total Value of Awards $1.5MM
First Award Date 01/01/85
Most Recent Award Date 01/01/92

Key Personnel

Last Name Name Awards Contact
Hawkins Dr. Frederick J Hawkins 2
Bearer Craig M Bearer 2
Simm David Simm 3

9 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 92-2
Budget: 01/01/92 - 12/31/92
PI: Unavailable

THIS PROJECT WILL DEVELOP A SPACECRAFT SUPERCOMPUTER (SSC) FOR FUTURE NASA MISSIONS. THE SSC WOULD HAVE COMPUTATIONAL CAPABILITIES AT LEAST AN ORDER OF MAGNITUDE GREATER THAN CURRENT FLIGHT ARCHITECTURES. BY USING EXISTING OR EMERGING MICROPROCESSOR TECHNOLOGY AND A NOVEL CONNECTIVITY ARCHITECTURE, IT WOULD PROVIDE SUFFICIENT MEMORY AND COMMUNIC...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-1
Budget: 01/01/91 - 12/31/91
PI: Unavailable

Phase 1 SBIR

Agency: Department of Transportation
Topic: 1991
Budget: 01/01/91 - 12/31/91

THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY POSITION MONITORING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS AND ALARMS TO REMOTE MONITORING STATIONS. THIS EFFORT WILL EVALUATE LORAN AN...

Phase 1 SBIR

Agency: Department of Transportation
Topic: 1991
Budget: 01/01/91 - 12/31/91

THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY STATUS MONITOR AND REPORTING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH THE BUOY PHOTOVOLTAIC POWER SUPPLY AND THE BUOY POSITION MONITORING SYSTEM FOR COMMUNICATION WITH REMOTE MONITORING STATIONS. THE SYS...

Phase 1 SBIR

Agency: Department of Transportation
Topic: 1991
Budget: 01/01/91 - 12/31/91

THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY PHOTOVOLTAIC POWER SUPPLY DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS TO REMOTE MONITORING STATIONS. DESIGN WORK WILL DEVELOP NEW APPROACHES TO THE...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-2
Budget: 01/01/89 - 12/31/89

THE INNOVATION TO BE DVELOPED IS A PROTOTYPE DISTRIBUTED CONCEPT ORIENTED EXPERT SYSTEM FOR APPLICATION TO SPACECRAFT ANALYSIS MONITORING AND CONTROL. SYSTEM FUNCTIONS WILL BE PERFORMED BY SEMI-AUTONOMOUS EXPERT MODULES WORKING TOGETHER UNDER THE COORDINATION AND CONTROL OF A SUPERVISORYEXPERT . CONCEPT ORIENTED REPRESENTATIONS OF BOTH KNOWLEDGE...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-1
Budget: 01/01/88 - 12/31/88

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-2
Budget: 01/01/87 - 12/31/87

CURRENT SPACECRAFT DATA HANDLING SYSTEMS USING TIME DIVISIONMULTIPLEXED (TDM) TECHNIQUES ARE FREQUENTLY MISSION-UNIQUE DESIGNS. USE OF DATA PACKETS PROVIDE SEVERAL BENEFITS INCLUDING IMPROVED GROUND DATA PROCESSING. INCORPORATION OFDATA TRANSPARENCY CAN ALSO ENHANCE UTILIZATION OF GROUND EQUIPMENT FOR MULTIPLE MISSION PHASES. THE INCREASED SOPHI...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 85-1
Budget: 01/01/85 - 12/31/85