Colorado Research Development

1727 Conestoga St
Boulder, CO 80301

SBIR Award Summary

Total Number of Awards 8
Total Value of Awards $1.43MM
First Award Date 01/01/84
Most Recent Award Date 01/01/91

Key Personnel

Last Name Name Awards Contact
Mahan John E Mahan 2
quinlan Daniel j quinlan 1
Liu Chaoqun Liu 2
deeter Jack e. deeter 2
linden James c. linden 1
Mccormick Steve Mccormick 2

8 Awards Won

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-2
Budget: 01/01/91 - 12/31/91

THE PURPOSE OF THIS PROJECT IS TO DEVELOP AN ACCURATE AND HIGHLY EFFICIENT PARALLEL ALGORITHM BASED ON ASYNCHRONOUS, MULTILEVEL, ADAPTIVE METHODS FOR COMPUTATIONAL FLUID DYNAMICPROBLEMS INVOLVING TRANSITION CAUSED BY CANONICAL ROUGHNESS ELEMENTS. BOUNDARY LAYER TRANSITION XTREMELY SENSITIVE TO THE PRESENCE AND NATURE OF ROUGHNESS ELEMENTS, BUT V...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-1
Budget: 01/01/88 - 12/31/88

NASA IS CURRENTLY SUPPORTING A VERY PROMISING PROJECT FOR DEVELOPMENT OF A HIGH-POWERED MULTIPROCESSOR SYSTEM, THE NAVIER-STOKES COMPUTER (NSC). WHILE MULTILEVEL ALGORITHMS ARE BEING STUDIED IN THE NSC ENVIRONMENT FOR SOLVING THE ELLIPTIC EQUATIONS THAT ARISE IN DISCRETIZING INCOMPRESSIBLENAVIER-STOKES EQUATIONS, NO RESEARCH HAS YET FOCUSED ON L...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-2
Budget: 01/01/87 - 12/31/87

THE PHASE I RESEARCH IS A FUNDAMENTAL INVESTIGATION OF THE OPTICAL PROPERTIES OF THREE NARROW BANDGAP, SEMICONDUTING TRANSITION METAL SILICIDES. THESE MATERIALS MAY BE SUITABLE FOR THE DEVELOPMENT OF A NEW CLASS OF INTRINSIC INFRARED DETECTORS INTEGRATED DIRECTLY ONTO A SILICON CHIP. DISTINCT ADVANTAGES INCLUDES A COMPATABILITY WITH EXISTING SIL...

Phase 2 SBIR

Agency: Department of Energy
Topic: 1985
Budget: 01/01/85 - 12/31/85

THIS PROJECT WILL STUDY, IN THE CONTEXT OF HIGH PERFORMANCE COMPUTER SYSTEMS, THE NEWLY CONCEIVED FAST ADAPTIVE COMPOSITE GRID METHOD (FAC) FOR NUMERICAL SOLUTION OF PARTIAL DIFFERENTIAL BOUNDARY VALUE PROBLEMS. FAC IS A METHOD FOR ADAPTING LOCAL GRIDS TO RESOLVE LOCAL PHYSICAL PHENOMENA AND FOR VERY FAST SOLUTION OF THE RESULTING DISCRETE EQUAT...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 85-1
Budget: 01/01/85 - 12/31/85

Phase 1 SBIR

Agency: Department of Energy
Topic: 1984
Budget: 01/01/84 - 12/31/84

THE FERMENTATIVE PRODUCTION OF CHEMICAL FEEDSTOCKS IS AGAIN BECOMING COMPETITIVE TO PETRO-CHEMICAL TECHNOLOGY. REVIVAL OF THE CLOSTRIDIUM ACETOBUTYLICUM FERMENTATION FOR THE PRODUCTION OF ACETONE AND BUTANOL WILL UTILIZE NEW DEVELOPMENTS IN BIOTECHNOLOGY. THE OVERALL GOAL OF THIS PROJECT WOULD BE TO OVERCOME THE GREATEST SHORTCOMING OF THE BUTAN...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1984
Budget: 01/01/84 - 12/31/84