Photometrics Ltd

3440 East Britannia Dr Suite, 110
Tucson, AZ 85706

SBIR Award Summary

Total Number of Awards 12
Total Value of Awards $1.97MM
First Award Date 01/01/85
Most Recent Award Date 01/01/95

Key Personnel

Last Name Name Awards Contact
Aikens Richard Aikens 2
Mccurnin Dr. Thomas W Mccurnin 1
Sims Gary R. Sims 6
bavier Charles e. bavier 4
Schempp William V. Schempp 1
Damento Michael A. Damento 2
Teesdale Gregory M. Teesdale 1

12 Awards Won

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 95-1
Budget: 01/01/95 - 12/31/95

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1995
Budget: 01/01/95 - 12/31/95

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 94-1
Budget: 01/01/94 - 12/31/94

We will develop and characterize a common-path or Sagnac interferometer with CCD array detector that can be used as a space-borne or field spectrometer from the UV to the IR region of the spectrum. The specific innovation is that the entire interferometer assembly (beamsplitter, mirrors, lens, and associated optics) will be fabricated as a monol...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-2
Budget: 01/01/91 - 12/31/91

INVESTIGATION INTO THE FEASIBILITY OF CONSTRUCTING LARGE FORMAT THINNED BACKSIDE ILLUMINATED CCDS AND CCD MOSAICS IS PROPOSED. THE PROBLEMS ASSOCIATED WITH UNIFORMLY THINNING LARGE SILICON AREAS, MOUNTING THE THINNED MEMBRANE TO A RIGID SUPPORT SUCH THAT A DESIRED OPTICAL FIGURE IS OBTAINED, AND MAKING RELIABLE ELECTRICAL CONTACT TO THE CCD ARE ...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 91-2
Budget: 01/01/91 - 12/31/91

LONG-TERM NASA NEEDS FOR MODELING ASTRONAUTS DURING EVA AND SPACE CONSTRUCTION ACTIVITIES REQUIRES THE DEVELOPMENT OF AN INTEGRATED SIMULATION CAPABILITY. SINCE THE ASTRONAUTE MUST WEAR RESTRICTIVE CLOTHING, THEY MUST BE MODELED IN A WAY WHICH REFLECTS THEIR LOSS OF NORMAL RANGE PERFORMANCE. THE INTEGRATED SIMULATION ENVIRONMENT PROVIDES A MEANS...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90

Phase 2 SBIR

Agency: National Science Foundation
Topic: 1989
Budget: 01/01/89 - 12/31/89

CHARGE COUPLED DEVICES (CCDS) WITH HIGH SENSITIVITY IN THE BLUE-VISIBLE AND ULTRAVIOLET SPECTRAL REGION ARE REQUIRED FOR MANY PROPOSED INVESTIGATIONS IN ASTRONOMY. THE BEST APPROACH TO IMPROVE CCD SENSITIVITY IN THESE WAVELENGTHS IS THINNED, BACKSIDE ILLUMINATION, BUT SUCH DEVICES ARE NOT CURRENTLY COMMERCIALLY AVAILABLE. COMMERCIAL DEVICES PROD...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1988
Budget: 01/01/88 - 12/31/88

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-1
Budget: 01/01/88 - 12/31/88

THE PROPOSED STUDY WILL EVALUATE THE FEASIBILITY OF CONSTRUCTING A HIGH-RESOLUTION MULTI-CCD CAMERA SYSTEM (MCCS) FOR USE IN A TIME DELAYED INTEGRATION (TDI) IMAGING MODE FOR WIDE-FIELD ASTRONOMICAL IMAGING. THE MCCS WILL EMPLOY TEN, 1024 BY 1024 PIXEL CCDS ARRANGED IN A STAGGERED FORMAT TO PROVIDE A RESOLUTION WIDTH OF OVER ONE MILLION DETECTOR...

Load More