Integrated Systems I

201 Moffett Park
Sunnyvale, CA 94089

SBIR Award Summary

Total Number of Awards 15
Total Value of Awards $2.04MM
First Award Date 01/01/83
Most Recent Award Date 01/01/96

Key Personnel

Last Name Name Awards Contact
walker Robert a. walker 4
Briggs M Michael Briggs 1
Kosut Robert L Kosut 6
lyons Michael g. lyons 1
Hussein Bassam Hussein 1
Kulich David Kulich 1
lev-ari Hanoch lev-ari 1
Emami-naeini Abbas Emami-naeini 1

15 Awards Won

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1996
Budget: 01/01/96 - 12/31/96

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 95-1
Budget: 01/01/95 - 12/31/95

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 94-2
Budget: 01/01/94 - 12/31/94

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 93-1
Budget: 01/01/93 - 12/31/93

Phase 1 SBIR

Agency: National Science Foundation
Topic: 1992
Budget: 01/01/92 - 12/31/92

THE OBJECTIVE OF THE PRESENT PROPOSAL IS THE DEVELOPMENT OF SOME MATHEMATICAL AND COMPUTATIONAL TOOLS THAT ARE APPROPRIATE TO THE NEXT GENERATION OF CACSD (COMPUTER AIDED CONTROL SYSTEM DESIGN) ENVIRONMENTS. THESE FUTURE CACSD PACKAGES WILL BE RADICALLY DIFFERENT FROM THE PRESENT PACKAGES IN THAT THEY WILL TRULY BE ABLE TO PERFORM CONTROL SYSTEM...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1992
Budget: 01/01/92 - 12/31/92
PI: Unavailable

THE PRINCIPAL OBJECTIVE OF PHASE I IS DEVELOPMENT OF METHODS FOR OBTAINING PROCESS MODELS FROM IN-SITU AND POSTMORTEM MEASUREMENTS THAT CAN BE USED FOR EITHER QUALITY CONTROL OR FEEDBACK CONTROL. A NOVEL FEATURE OF THIS APPROACH IS TO IDENTIFY THE PROCESS BY USING THE HIDDEN MARKOV MODEL (HMM), WHICH HAS BEEN USED EXTENSIVELY IN SPEECH RECOGNITI...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-1
Budget: 01/01/90 - 12/31/90

MANY ENVISIONED MISSIONS FOR LARGE-SPACE-STRUCTURES (LSS) MUST SATISFY STRINGENT PERFORMANCE DEMANDS, AND HENCE, WILL REQUIRE SOME COMBINATION OF ACTIVE AND PASSIVE CONTROL. IT IS PROPOSED THAT THESE PERFORMANCE REQUIREMENTSMAY BE MORE AFFECTIVELY ACHIEVED BY INTEGRATING THE STRUCTURAL DESIGN WITH THE CONTROL DESIGN TO ACCRUE SIGNIFICANT PERFORM...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 90-2
Budget: 01/01/90 - 12/31/90

THE OBJECTIVE OF THE PRESENT PROPOSAL IS THE DEVELOPMENT OF EFFICIENT TECHNIQUES FOR SYSTEM IDENTIFICATION AND ADAPTIVE CONTROL OF LARGE SPACE STRUCTURES (LSS). MANY OF THE ENVISIONED FUTURE SPACE MISSIONS WILL IMPOSE STRINGENT PERFORMANCE DEMANDS ON TRACKING ACCURACY, RESPONSE TIME, ANDACTIVE SUPRESSION OF STRUCTURAL VIBRATIONS OF SUCH STRUCTUR...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89

THE OBJECTIVE OF THIS PROPOSAL IS TO PERFORM NUMERICAL OPTIMIZATION OF HYPERSONIC BODY CONFIGURATIONS APPLICABLE TOSINGLE-STAGE-TO-ORBIT AEROSPACE PLANE CONFIGURATIONS. FORMAL OPTIMIZATION OF HIGH-SPEED VEHICLE CONFIGURATIONS IN TERMS OF MINIMIZING SOME COST FUNCTION HAS BEEN LIMITED TO SIMPLE AXISYMMETRIC SHAPES ADDRESSED USING SIMPLIFIED AEROD...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 89-1
Budget: 01/01/89 - 12/31/89

Load More