Joseph Hepp Engineering

22323 Lanark Street
Canoga Park, CA 91304
1 Employee

SBIR Award Summary

Total Number of Awards 5
Total Value of Awards $1.09MM
First Award Date 01/01/95
Most Recent Award Date 03/18/05

Key Personnel

Last Name Name Awards Contact
Hepp Mr. Joseph H. Hepp 4 Message
Hepp Jospeh H. Hepp 1

5 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF05-195
Budget: 03/18/05 - 03/18/06

A hypersonic engine application may require a sophisticated system to maintain the hot wall structure of the combustion chamber within structural temperature limits. Ablative insulation protects the structure for single mission requirements, but regenerative cooling is required for reusability or severe flight envelopes. At the upper limits of...

Phase 2 SBIR

Agency: Air Force
Topic: AF98-233
Budget: 03/15/00 - 01/15/02

Current flightline support equipment is not well adapted to the rapid mobilization and efficient deployment of today's tactical forces, because of the large amount of equipment that must accompany each aircraft unit. Rolling stock alone accounts for nearly 70% of the deployment package. Most powered units perform only a single function, and ea...

Phase 1 SBIR

Agency: Air Force
Topic: AF98-233
Budget: 10/27/98 - 07/27/99

An engine-generator set is proposed for the Burnt Mountain Seismic Observatory which was not considered in the original 1994 review of alternative power systems. It is a mechanical system which provides much higher efficiency than solid-state devices, and much higher reliability than other mechanical power systems. It has been designed for aircr...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 98-1
Budget: 01/01/98 - 12/31/98
PI: Unavailable

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 95-1
Budget: 01/01/95 - 12/31/95