Simwright, Inc.

2053 Fountain Professional Court Suite A
Navarre, FL 32566
http://www.simwright.com
250 Employees

SBIR Award Summary

Total Number of Awards 18
Total Value of Awards $5.78MM
First Award Date 05/22/98
Most Recent Award Date 08/18/11

Key Personnel

Last Name Name Awards Contact
Lester Mr. Eric Lester 3 Message
Matthews Mr. Dan Matthews 7 Message
Christopher Mr. Kerry D. Christopher 7 Message
Stewart Mr. Brian Stewart 1 Message

18 Awards Won

Phase 1 SBIR

Agency: Defense Health Program
Topic: OSD11-H04
Budget: 08/18/11 - 02/17/12

One of the most significant issues facing amputees leaving rehabilitation units is the loss of connectivity with peers and caregivers. The new Amputee Virtual Environment Support Space (AVESS) being constructed within Second Life is a great resource enabling social networking between returning amputees and caregivers. Emerging haptic devices and...

Phase 1 SBIR

Agency: Navy
Topic: N092-094
Budget: 09/23/09 - 03/23/10

In order to generate geospecific materialization and textures for synthetic scenes derived from satellite based stereo imagery, a complete model or description of the reflectance is required for surfaces in that scene. Surface reflectance accounts for various characteristics the human eye uses to distinguish objects in natural or image scenes. A...

Phase 2 SBIR

Agency: Air Force
Topic: AF081-070
Budget: 06/23/09 - 09/30/11

The complexity and speed of operations combating insurgents employing asymmetric tactics requires coordinated sensing, collaboration, and targeting to attack terrorists who may be fleeing a scene to find sanctuary in schools or mosques. High level military strategists realize the need for a more rapid strike capability and lower cost smart weap...

Phase 2 SBIR

Agency: Navy
Topic: N07-045
Budget: 02/11/09 - 02/10/11

One of the main characteristics in the Global War on Terrorism (GWOT) is the dependence on nighttime covert missions. Special Forces combat training is predicated on training as you fight. A major addition to improving realism in mission rehearsal training would be geospecific nighttime scenes. In addition, with the multifunctional capabilities ...

Phase 1 SBIR

Agency: Air Force
Topic: AF081-070
Budget: 05/19/08 - 02/28/09

SimWright Inc. proposes a capability to georegister objects for gimbaled hyperspectral systems in: surveillance, reconnaissance, and tracking modes while enabling targeting. The concept proposes significant georegistration error reduction between features commonly identified in multiple sensor sweeps than traditional systems by combining existin...

Phase 1 SBIR

Agency: Navy
Topic: N07-045
Budget: 06/22/07 - 12/22/07

To meet future JSF programmatic needs and to augment SOF mission planning and training capability, SimWright proposes eight trade studies and a risk mitigation program leading to a system design to generate geo-specific terrain databases. The eight trades studies are characterized as: - Night Imagery Sources Study - Street Light Feature Extracti...

Phase 2 SBIR

Agency: Navy
Topic: N04-015
Budget: 04/29/05 - 04/29/07

The objective of this Phase II SBIR development effort is to automate the process for extracting obstruction clearance features. These processes developed here will have direct applicability to other automated geospatial feature extraction problems. This development will include combining computer vision based algorithms and photogrammetric tec...

Phase 1 SBIR

Agency: Navy
Topic: N05-017
Budget: 03/19/05 - 08/17/05

Developments in cultural feature extraction have resulted in a number of disparate processes some based primarily on photogrammetric approaches and some based primarily on image processing approaches. Almost all the practical implementations to date have resulted in tools that assist an operator in feature extraction but are not fully automatic....

Phase 2 SBIR

Agency: Navy
Topic: N02-192
Budget: 08/23/04 - 08/23/06

The purpose of this SBIR topic is to explore and implement technologies capable of automatically extracting three dimensional feature sets from aerial imagery. Successful implementation of these technologies will speed the process and decrease the cost of developing complex, geospatially accurate databases for military training and mission rehea...

Phase 1 SBIR

Agency: Navy
Topic: N04-015
Budget: 03/10/04 - 09/10/04

Cultural development often results in features that obstruct visual and RF view sheds and can constitute obstructions to flight paths for airports and operational missions. Tools are needed that provide for rapid assessment of vertical obstructions for operations worldwide. These tools should be capable of extracting data from diverse imagery so...

Load More