Imaginestics, LLC

3495 Kent Avenue, Suite A100
West Lafayette, IN 47906
http://www.imaginestics.com
22 Employees

SBIR Award Summary

Total Number of Awards 8
Total Value of Awards $2.19MM
First Award Date 01/01/04
Most Recent Award Date 10/08/14

Key Personnel

Last Name Name Awards Contact
Rathod Mr. Nainesh Rathod 7 Message
Czepil Joseph Czepil 1 Message
Fields Lloyd R Fields 0 Message

8 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF141-213
Budget: 10/08/14 - 06/07/15

ABSTRACT: A challenge which continues to present a barrier to the utilization of AM and wide spread adoption is knowing when to use the technology. This is particularly problematic in aerospace and in MRO operations because the technology is still emerging, and knowledgeable, experienced practitioners remain in short supply and will likely rema...

Phase 2 SBIR

Agency: Defense Logistics Agency
Topic: DLA07-001
Budget: 06/02/10 - 06/01/12

DoD agencies are facing growing challenge of maintaining aging Warfighter Systems, while reducing procurement costs of discrete-parts. One key hindrance to ensuring readiness is discrete part procurement. When procuring parts, tech data package which is provided to the suppliers during pre and post-award contains raster drawings which are often ...

Phase 1 SBIR

Agency: Defense Logistics Agency
Topic: DLA07-001
Budget: 11/08/07 - 05/08/08

Defense Procurement/Maintenance agencies are facing growing challenge of maintaining aging Warfighter Systems and ensuring mission readiness for global commitments, while reducing procurement costs of discrete-parts. One key hindrance to ensuring readiness is discrete part procurement. When procuring parts, tech data package which is provided to...

Phase 2 SBIR

Agency: National Science Foundation
Topic: 2006
Budget: 01/01/06 - 12/31/06

This Small Business Innovation Research Phase II project will achieve higher retrieval accuracy for shape-based search for both the web and the enterprise. The proposed work in Phase II is to achieve higher retrieval accuracy supported by three key components: 1) pose determination for 3D models: bridging the space gap between 2D and 3D shapes b...

Phase 1 SBIR

Agency: Army
Topic: A05-227
Budget: 11/14/05 - 05/14/06

The US Army is currently faced with a serious obstcale in its effort to undertake rapid and cost efficient upgrade of its weapons platforms due to the inability of CAD applications to archive and retrieve existing design information. This inability is mainly due to the lack of an archival system to store important design information and inadeq...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 2005
Budget: 01/01/05 - 12/31/05

This Small Business Innovation Research Phase I project explores the feasibility to develop a Supply Chain Optimization and Product Explorer (SCOPE) that includes a unique 3D Shape Search technology, and enables tighter integration across the extended enterprise and seamless flow of information up the supply chain to decision makers at the point...

Phase 2 SBIR

Agency: National Science Foundation
Topic: 2005
Budget: 01/01/05 - 12/31/05

This Small Business Innovation Research (SBIR) Phase II project will develop prototype architecture of an engineering advisory system and validate its application. Although the cost of product design could be only about 5% of the total product cost, decisions made during the design stage can contribute as much as 70-80% to the final product cost...

Phase 1 SBIR

Agency: National Science Foundation
Topic: 2004
Budget: 01/01/04 - 12/31/04

This Small Business Innovation Research (SBIR) Phase II project will develop prototype architecture of an engineering advisory system and validate its application. Although the cost of product design could be only about 5% of the total product cost, decisions made during the design stage can contribute as much as 70-80% to the final product cost...