Anco Engineers, Inc.

1965 A 33rd Street
Boulder, CO 80301
http://www.ancoengineers.com
20 Employees

SBIR Award Summary

Total Number of Awards 13
Total Value of Awards $2.11MM
First Award Date 01/01/83
Most Recent Award Date 05/04/06

Key Personnel

Last Name Name Awards Contact
Ibanez Dr. Paul Ibanez 8 Message
Ibanez William Wal Paul Ibanez Ibanez William Wal 2
Howard Dr. George E Howard 1
stoessel John c. stoessel 1
Bernstein Dr. Karl Bernstein 1

13 Awards Won

Phase 1 SBIR

Agency: Office of the Secretary of Defense
Topic: OSD05-H13
Budget: 05/04/06 - 05/04/07

Military platforms expose personnel to extreme vertical vibrations. These vibrations can induce visual-vestibular disturbance or even permanent injury, resulting in spatial-disorientation-related mishaps or decreased performance due to motion-sickness. ANCO Engineers, Inc. proposes to investigate the feasibility of a human-rated, computer-cont...

Phase 1 SBIR

Agency: Army
Topic: A97-095
Budget: 11/10/97 - 05/09/98

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-1
Budget: 01/01/88 - 12/31/88

CONSIDERABLE EFFORT HAS BEEN DEVOTED BY NASA AND OTHER ORGANIZATIONS COMMITTED TO THE UTILIZATION OF TETHERS IN SPACE. HOWEVER, MOST TETHER DEPLOYMENT SCENARIOS HAVE A COMMON DENOMINATOR--THEY ARE DEPENDENT ON THE REUSABILITY OF SUCH TETHERS IN ORDER TO BE CONSIDERED ECONOMICALLY VIABLE. THE LACK OF DATA ON POTENTIAL FOR TETHER DAMAGE AND THE RE...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 88-2
Budget: 01/01/88 - 12/31/88
PI: Unavailable

QUALITY ASSURANCE (QA) EFFORTS DURING LAUNCH SITE PROCESSINGINVOLVE INSPECTION, SURVEILLANCE, AND IMPLEMENTATION OF STANDARDS TO ASSURE CONSISTENTLY SAFE RESULTS. A NEED EXISTS FOR THE CREATION OF A SYSTEM UTILIZING AN INSTRUMENTED TORQUE WRENCH CAPABLE OF AUTOMATICALLY RECORDING BOTH THE LOCATION OF THE BOLT, MAXIMUM TORQUE IMPOSED ON IT. ANCO'...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-1
Budget: 01/01/87 - 12/31/87
PI: Unavailable

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 87-2
Budget: 01/01/87 - 12/31/87

THE FEASIBILITY AND ECONOMICS OF USING TETHERS FOR STATION-KEEPING OR SLING LAUNCH OF PAYLOADS IS HIGHLY DEPENDENT ON THE RELIABLE CONTROL OF THE TETHER ITSELF IN ANENVIRONMENT. THE PROPOSED TETHER DEPLOYMENT MONITORING SYSTEM (TDMS) WOULD PROVIDE DATA ON THE TETHER'S CONDITION, GUIDANCE IMFORMATION, AND EARLY WARNING ON POSSIBLE FAILURE CONDITI...

Phase 2 SBIR

Agency: National Aeronautics and Space Administration
Topic: 86-2
Budget: 01/01/86 - 12/31/86

CONTINUAL MONITORING OF STRUCTURAL INTEGRITY AND DETECTION OF DAMAGE AND ITS SUBSEQUENT COMPENSATION, REPAIR, AND CONTROL ARE IMPORTANT CONSIDERATIONS FOR LARGE, COMPLEX SPACE STRUCTURES. PHASE I IS TO RESEARCH A SYSTEM WHICH WILL REDUCE THIS TASK TO A MODULE-BY-MODULE SELF-INTEGRITY MONITORING SYSTEM. A COMPLEX SPACE STRUCTURE WILL BE DIVIDED I...

Phase 1 SBIR

Agency: Department of Energy
Topic: 1985
Budget: 01/01/85 - 12/31/85

AS THE WORLD'S PRIME MINERAL DEPOSITS DWINDLE AND DEMAND GROWS, TECHNOLOGICAL INNOVATION IN MINERAL EXTRACTION BECOMES MORE IMPORTANT. THE CHALLENGE TAKES MANY FORMS, BUT THE NEED TO EXTRACT LEANER, MORE FINELY DISSEMINATED DEPOSITS IS A COMMON REQUIREMENT. ALSO, AS THE REMAINING DEPOSITS GET POORER, THE INCENTIVE TO TO REWORK TAILINGS LEFT BY P...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 85-1
Budget: 01/01/85 - 12/31/85

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 84-1
Budget: 01/01/84 - 12/31/84

Load More