Omega-p, Inc.

291 Whitney Avenue
New Haven, CT 06511
12 Employees

SBIR Award Summary

Total Number of Awards 120
Total Value of Awards $35.2MM
First Award Date 01/01/83
Most Recent Award Date 01/01/14

Key Personnel

Last Name Name Awards Contact
Hirshfield Dr. Jay L. Hirshfield 98 Message
Jacob Dr. Jonah H. Jacob 1
Lapointe Dr. Michael A Lapointe 1
Hirschfield Dr. Jay L. Hirschfield 4 Message
Ganguly Dr. Achintya K. Ganguly 3
Nezhevenko Dr. Oleg A. Nezhevenko 6 Message
Nezhevenko O. A. Nezhevenko 1 Message
Jirshfield Jay L. Jirshfield 2
Hirchfield Jay L. Hirchfield 1 Message
Trahan Mr. George P. Trahan 108 Message
Stanley-Santora Enid S. Stanley-Santora 1 Message

120 Awards Won

Phase 1 SBIR

Agency: Department of Energy
Topic: 31A-2014
Budget: 01/01/14 - 12/31/14

Dielectric materials are ubiquitous in accelerator structures for discovery science, industrial and medical applications. Further use of dielectrics in advanced accelerators, such as the dielectric wake field accelerator, also promises improved performance and cost savings. But undesirable electrical charging and/or damage of the dielectrics so...

Phase 1 SBIR

Agency: Department of Energy
Topic: 34 C-2013
Budget: 01/01/13 - 12/31/13

This SBIR project will be devoted to the development and demonstration of high-power X- band switches to operate with the two resonant delay lines of the SLED-II pulse compression system. Each switch is triggered with an intense electron beam drawn from a diamond-coated molybdenum cold cathode. Preliminary tests of prototype X-band switches us...

Phase 2 SBIR

Agency: Department of Energy
Topic: 27C-2013
Budget: 01/01/13 - 12/31/13

The 8 GeV pulsed linear accelerator that is being planned at Fermi National Accelerator Laboratory (FNAL) as part of its Project X requires a high-power radio frequency amplifier with parameters that are not available from commercial sources. Omega-P, Inc., in a technical collaboration with FNAL, is to develop, build, and deliver for tests at F...

Phase 2 SBIR

Agency: Department of Energy
Topic: 27C-2013
Budget: 01/01/13 - 12/31/13

The 8 GeV pulsed linear accelerator that is being planned at Fermi National Accelerator Laboratory (FNAL) as part of its Project X requires a high-power radio frequency amplifier with parameters that are not available from commercial sources. Omega-P, Inc., in a technical collaboration with FNAL, is to develop, build, and deliver for tests at F...

Phase 1 SBIR

Agency: Department of Energy
Topic: 27 C-2012
Budget: 01/01/12 - 12/31/12

The quest for deepened understanding of the origin of the universe requires continued search for elementary particles, for which high-energy accelerators are necessary tools. Reducing the size, complexity, and cost for future accelerators is essential if they are ever to be built. New technologies that can underlie future accelerators be they ...

Phase 1 SBIR

Agency: Department of Energy
Topic: 27 C-2012
Budget: 01/01/12 - 12/31/12

The quest for deepened understanding of the origin of the universe requires continued search for elementary particles, for which high-energy accelerators are necessary tools. Reducing the size, complexity, and cost for future accelerators is essential if they are ever to be built. New technologies that can underlie future accelerators, be they...

Phase 2 SBIR

Agency: Department of Energy
Topic: 65 A-2011
Budget: 01/01/11 - 12/31/11

In a two-beam accelerator, a high-current drive beam imparts energy to a low current test beam by generating microwave power that flows from one beam to the other. The largest project of this sort is CLIC, located at CERN in Geneva, Switzerland, that is being designed for operation at an electron-positron center-ofmass energy as high as 3 TeV. T...

Phase 1 SBIR

Agency: Department of Energy
Topic: 66 A-2011
Budget: 01/01/11 - 12/31/11

The quest for deepened understanding of the origin of the universe requires continued search for elementary particles, for which high-energy accelerators are necessary tools. Reducing the size, complexity, and cost for future accelerators is essential if they are ever to be built. New technologies that can underlie future accelerators are needed...

Phase 2 SBIR

Agency: Department of Energy
Topic: 64 E-2011
Budget: 01/01/11 - 12/31/11

Thermionic cathodes are in use in an overwhelming majority of vacuum electronics devices, including high-power RF sources used to drive particle accelerators. These cathodes do not operate reliably or have long lifetime if their current density exceeds 5-10 Amperes/cm2. Artificial diamond and related materials, produced by chemical vapor deposit...

Phase 1 SBIR

Agency: Department of Energy
Topic: 44 A-2011
Budget: 01/01/11 - 12/31/11

The quest for deepened understanding of the origin of the universe requires continued search for elementary particles, for which high-energy accelerators are necessary tools. Reducing the size, complexity, and cost for future accelerators is essential if they are ever to be built. New technologies that can underlie future accelerators are needed...

Load More