Weldqc, Inc.

1165 Chambers Road
Columbus, OH 43212
http://www.weldqc.com
4 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $668K
First Award Date 06/21/04
Most Recent Award Date 02/09/06

Key Personnel

Last Name Name Awards Contact
Barborak Dr. Darren Barborak 1 Message
Paskell Mr. Troy Paskell 2 Message

3 Awards Won

Phase 1 SBIR

Agency: Navy
Topic: N05-154
Budget: 02/09/06 - 08/18/06

Gas tungsten arc welding (GTAW) is the most widely used manufacturing process for producing high-quality welds in piping for Navy ship construction. The majority of welds in these piping applications must achieve complete penetration of the weld joint. However, in practice, a variety of factors affect the ability to consistently produce compl...

Phase 1 SBIR

Agency: Navy
Topic: N04-124
Budget: 07/06/04 - 01/05/04

Arc Welding of titanium has always been a challenging engineering problem, requiring shielding from atmospheric contamination (e.g., oxygen and nitrogen) until the metal is below approximately 400oC. Small titanium weldments are typically welded in inert gas chambers. However chambers are impractical for welding large structures. Instead, a...

Phase 2 SBIR

Agency: Navy
Topic: N03-105
Budget: 06/21/04 - 06/21/06

In Phase 1, a prototype system was developed to demonstrate both the technical feasibility and the financial viability of developing a system for managing welding procedure information both within the shipyard and across the supply chain. The system was referred to as the Intelligent Shipyard Welding Procedure System (ISWP). The ISWP System wi...