All-tech Solutions

1544 N Woodland Park Drive
Layton, UT 84041
http://www.atsi-info.com
90 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $2.35MM
First Award Date 08/03/06
Most Recent Award Date 04/04/13

Key Personnel

Last Name Name Awards Contact
McNeill Mr. Todd McNeill 2 Message
Rooks Clint Rooks 1 Message

3 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF06-339
Budget: 04/04/13 - 03/04/15

ABSTRACT: Recent SES full-scale testing of composite Instrument Landing System Glide Slope (ILS/GS) Towers indicates that frangibility for these large NAVAID structures is indeed possible. However, there is currently no clear and definitive definition of frangibility (with respect to force and energy) for an ILS Glide Slope tower; or any other...

Phase 2 SBIR

Agency: Air Force
Topic: AF06-339
Budget: 09/28/07 - 09/27/09

The technical objectives of this SBIR proposal include the design verification of a frangible composite ILS Glideslope Tower that will maintain existing tolerances and mission performance capabilities. Zephyr Engineering Services [ZES ] (formerly All-Tech Solutions, Inc. [ATSI] ), technical approach is based upon the probability demonstrated t...

Phase 1 SBIR

Agency: Air Force
Topic: AF06-339
Budget: 08/03/06 - 05/02/07

The technical objectives of this SBIR proposal include the design and verification of a frangible composite ILS Glideslope Tower that does not require guy wires (i.e., will maintain existing tolerances and mission performance capabilities). ATSI s technical approach is based upon the high probability that a qualified, frangible Glideslope Tower...