Acta Incorporated

2790 Skypark Drive, Suite 310
Torrance, CA -
http://www.actainc.com
65 Employees

SBIR Award Summary

Total Number of Awards 34
Total Value of Awards $9.07MM
First Award Date 01/01/94
Most Recent Award Date 06/30/14

34 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF141-141
Budget: 06/30/14 - 03/26/15

ABSTRACT: This is a nine-month SBIR Phase I project titled Weapons Effects FRMs for Contact or Embedded detonations in Fixed Targets. The stated objective of this solicitation topic is to develop innovative High-Fidelity Physics-Based (HFPB) Fast-Running Models (FRMs) for simulating the effects of weapons detonated on contact or embedded in f...

Phase 1 STTR

Institution: Sandia National Laboratories

Agency: Air Force
Topic: AF13-AT01
Budget: 10/23/13 - 07/22/14

ABSTRACT: ACTA and Sandia National Laboratories will develop and demonstrate advanced concepts for processing large and disparate data streams from multiple classes of sensors using multi-physics based mappings based upon stochastic non-linear networks. Fusion of incertitude will be demonstrated with algorithms based on KDE/ICA (kernel density ...

Phase 2 SBIR

Agency: Air Force
Topic: AF121-097
Budget: 06/20/13 - 09/20/15

ABSTRACT: Most of the air delivered air force weapons are designed to detonate inside structures. However, due to targeting inaccuracies and other reasons they may land outside a structure and could detonate partially or fully buried in soil. These events could result in collateral damage to people, vehicles in the vicinity. Air force would l...

Phase 1 SBIR

Agency: Air Force
Topic: AF121-097
Budget: 05/10/12 - 02/10/13

ABSTRACT: Most of the air delivered air force weapons are designed to detonate inside structures. However, due to targeting inaccuracies and other reasons they may land outside a structure and could detonate partially or fully buried in soil. These events could result in collateral damage to people, vehicles in the vicinity. Air force would l...

Phase 2 SBIR

Agency: Air Force
Topic: AF103-134
Budget: 11/09/11 - 02/12/14

ABSTRACT: Functional Kill of buildings and below-ground structures is becoming an increasing area of concern for war fighters. Functional Kill refers to defeating a building by rendering it or its contents (infrastructure) functionally incapable of performing the overall mission for which the building was designed. AFRL/RWPL is seeking innovat...

Phase 1 SBIR

Agency: Air Force
Topic: AF103-131
Budget: 01/18/11 - 10/18/11

The secondary debris generated during the breakup of walls and slabs interacts with the high pressure gases passing through cracks in the separated material. This interaction causes a reduction of blast/gas loads in the blast room and acceleration (and sometimes further breakup) of secondary debris that can be lethal to personnel and equipment i...

Phase 1 SBIR

Agency: Air Force
Topic: AF103-134
Budget: 01/18/11 - 10/18/11

Functional Kill of buildings and below-ground structures is becoming an increasing area of concern for war fighters. Functional Kill refers to defeating a building by rendering it or its contents (infrastructure) functionally incapable of performing the overall mission for which the building was designed. AFRL/RWPL is seeking innovative method...

Phase 2 STTR

Institution: Sandia National Laboratories

Agency: National Aeronautics and Space Administration
Topic: 09-2-T5.01
Budget: 01/01/11 - 12/31/11

ACTA and Sandia National Laboratories propose to quantify and propagate substructure modeling uncertainty for reduced-order substructure models to higher levels of system assembly, thereby enabling predictive simulations of engineering designs with quantified margins and uncertainties for model-based flight qualification of complete spacecraft. ...

Phase 2 SBIR

Agency: Air Force
Topic: AF083-094
Budget: 09/22/10 - 09/22/12

A 24-month SBIR Phase II Project titled Weapons Effects FRMs for Small Munitions on Urban Reinforced Concrete Walls/Slabs. The stated objective of this solicitation topic is to develop High-Fidelity Physics-Based (HFPB) Fast-Running Models (FRMs) for simulating the effects of small weapons in urban structures and materials. This proposal cov...

Phase 2 SBIR

Agency: Air Force
Topic: AF083-094
Budget: 09/16/10 - 09/16/12

A 24-month SBIR Phase II Project titled Weapons Effects FRMs for Small Munitions on Urban Masonry Walls is proposed. The stated objective of this solicitation topic is to develop High-Fidelity Physics-Based (HFPB) Fast-Running Models (FRMs) for simulating the effects of small weapons in urban structures and materials. This proposal covers mas...

Load More