Mustang Technology Group, L.p.

690 K Ave
Plano, TX -
http://mustangtechnology.com
125 Employees

SBIR Award Summary

Total Number of Awards 43
Total Value of Awards $19.1MM
First Award Date 05/30/03
Most Recent Award Date 10/21/13

43 Awards Won

Phase 1 SBIR

Agency: Air Force
Topic: AF132-001
Budget: 10/21/13 - 07/20/14

ABSTRACT: Mustang Technology Group, LP proposes an aggressive program of innovation research for the design of a rugged, open architecture, long-life data transfer device that will lower overall life cycle costs by avoiding future obsolescence. This proposed Phase I effort focuses on reviewing the current DTDs for commonalities and differences t...

Phase 1 SBIR

Agency: Air Force
Topic: AF131-102
Budget: 07/31/13 - 04/26/14
PI: Jeff Lyon

ABSTRACT: Mustang Technology Group, LP is proposing a Phase I SBIR study that will expand the capability of air delivered weapons by providing a low cost, small form factor, multi-function radar seeker which has a flexible architecture which supports multiple radar modes and high speed data link communications. The seeker will be capable of pro...

Phase 1 SBIR

Agency: Army
Topic: A13-049
Budget: 07/10/13 - 01/10/14

This Phase I SBIR program will define the requirements and the development plan for a broadband monolithic microwave transceiver integrated circuit which will enable the production of the next generation of precision end-game proximity sensors suitable for deployment on low-cost high-volume precision Army weapons. The objective of this SBIR effo...

Phase 1 SBIR

Agency: Navy
Topic: N131-009
Budget: 05/15/13 - 11/15/13

Mustang proposes to develop innovative, low Size, Weight, and Power (SWaP) Digital Receiver Exciter (DREX) technologies needed for simultaneous operation of the U.S. Navy Fire Scout Radar Autonomous Collision and Avoidance System (RACAS) and Coherent Automatic Radar Periscope Detection and Discrimination (C-ARPDD) modes. The design will also sup...

Phase 2 SBIR

Agency: Navy
Topic: N102-129
Budget: 05/24/12 - 05/24/13

Mustang Technology Group, LP, presents an innovative, modular FPGA-based data recording system which offers radical improvements over current offerings for tactical data recorders. The FPGA-based approach delivers an initial order of magnitude increase in capability and allows for frequent, drop-in upgrades in storage capacity and performance as...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB082-019
Budget: 05/01/12 - 01/31/14

During the Phase I program, Mustang engineers collected radar data on dogs, cattle and other animals and compared it to existing human data to find extractable features and begin development of algorithms to discriminate between humans and animals. Phase I resulted in a rudimentary algorithm that can be used to discriminate humans and animals ba...

Phase 2 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB082-005
Budget: 05/01/12 - 01/31/14

Today's lower-cost, smaller weapons require low-cost seekers in increasingly smaller form factors. To this end, Mustang Technology Group is proposing a low-cost digital receiver development aimed at small munitions applications. Based upon our successful line of low-cost RF seeker technologies, this new development will provide the military with...

Phase 2 SBIR

Agency: Army
Topic: A10-037
Budget: 03/13/12 - 03/17/14

A laboratory-scale technology demonstrator of an active THz imager is proposed. This imager will penetrate brownout conditions and detect obstacles covertly. The demonstrator combines a transceiver and a image rendering system with sufficient resolution to image objects in brownout conditions up to 100 m away within a fixed field of view. The im...

Phase 2 SBIR

Agency: Navy
Topic: N102-131
Budget: 12/01/11 - 11/30/14

During the Phase I baseline SBIR contract Mustang has shown that with a new innovative hardware architecture, the 25-year old seeker mode control board functionality can be affordably replicated using 67% less circuit board area and 67% less power. This new innovative architecture will provide room, power, and cooling needed to expand the Seeker...

Phase 1 SBIR

Agency: Navy
Topic: N112-095
Budget: 10/26/11 - 04/26/12
PI: Ron Jahn

Mustang proposes to develop a conceptual design for a low cost, low power navigation solution suitable for deployment in size Group 2 Unmanned Aircraft Systems (UAS) and above. We will explore innovative methods for incorporating external navigation aids into the navigation solution and test key hardware components as part of our Phase I effort.

Load More