Issac Corp.

6760 Corporate Drive Array
Colorado Springs, CO 80919
http://www.issaccorp.com
12 Employees

SBIR Award Summary

Total Number of Awards 7
Total Value of Awards $2.47MM
First Award Date 02/01/12
Most Recent Award Date 09/16/16

Key Personnel

Last Name Name Awards Contact
Deiotte Ray Deiotte 3 Message
Grange Franklin Grange 2 Message
Jones Timothy L. Jones 3 Message
Deiote Ray Deiote 0 Message
Gattozzi Angelo Gattozzi 1 Message
Deiotte Raymond Deiotte 1 Message

7 Awards Won

Phase 2 STTR

Institution: Oak Ridge National Laboratory

Agency: Department of Defense
Topic: MDA13-T003
Budget: 09/16/16 - 09/15/18

The ISSAC Team propose a novel method to encapsulate legacy models and simulations that allows these components to take advantage of modern, multi-core, multi-processor hardware suites. Encapsulating these legacy codes provides 3 primary advantages to deal with complex systems and systems of systems (Air Force, Navy, Department of Homeland Secu...

Phase 1 STTR

Institution: University of Texas - Center for El

Agency: Navy
Topic: N16A-T009
Budget: 06/08/16 - 12/05/16

The ISSAC Team leverages existing knowledge and expertise in power system monitoring, fault identification, localization and isolation in conjunction with rich, deep data analytics for pattern matching to devise a system for Medium Voltage Direct Current (MVDC) power system fault management. Because of the differences between AC and DC power gri...

Phase 1 SBIR

Agency: Navy
Topic: N141-031
Budget: 07/07/14 - 01/03/15

ISSAC Corporation and the University of Texas (UT) at Austin Center for Electromechanics (CEM; together, the ISSAC Team ) propose to develop effective, efficient, secure, robust control system software for naval applications of smart- and micro-grid technology suitable for shipboard integrated power systems (IPS). The ISSAC Team will apply Mode...

Phase 1 STTR

Institution: Oak Ridge National Laboratory

Agency: Missile Defense Agency
Topic: MDA13-T003
Budget: 03/20/14 - 10/19/14

The ISSAC team (ISSAC Corp and Oak Ridge National Labs) provides a novel, formalism-based approach that will allow legacy simulations to leverage current, state-of-the-art computational power to expedite execution and coverage of a vast parameters space. The ISSAC team will leverage existing corporate capabilities and innovative methodologies r...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA14-011
Budget: 01/01/14 - 12/31/14

ISSAC Corp and subcontractor RTSync Corporation propose to develop a Statistically Significant Simulation (SSS) capability. The ISSAC Team SSS capability will comprise an ontology organizing an extensible family of M&S tools composable to meet on-demand the needs and Intended Uses of stakeholder users. The SSS ontology will include a hierarchi...

Phase 2 SBIR

Agency: Missile Defense Agency
Topic: MDA11-030
Budget: 11/07/13 - 11/06/15

The Elicitor tool developed under this SBIR will significantly reduce the time and manpower necessary to effectively elicit, characterize and analyze stakeholder needs. It will enable effective requirements generation and allocation to appropriate baselines, and it will reduce redundant efforts among the intended uses a system. By design, the ...

Phase 1 SBIR

Agency: Missile Defense Agency
Topic: MDA11-030
Budget: 02/01/12 - 07/31/12

The first, and arguably the most important, step in systems engineering is gathering stakeholder needs. Being able to elicit accurate, actionable needs from a stakeholder is nearly an art and is very difficult to standardize as each set of stakeholders may have drastically different needs. It is the intent of this effort to develop a process a...