Creative Engineering Solutions Inc.

11196 N. Cardinal Drive
Parker, CO 80138
4 Employees

SBIR Award Summary

Total Number of Awards 2
Total Value of Awards $614K
First Award Date 07/28/11
Most Recent Award Date 08/02/13

Key Personnel

Last Name Name Awards Contact
Michael Jim Michael 2 Message

2 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A11-061
Budget: 08/02/13 - 08/01/14

CES in cooperation with QinetiQ-NA successfully demonstrated a rapid deployment 18 thick, 24 wide x 24 tall, 400 pound applique support system that easily surpassed its Phase 1 performance requirement of 3-5 G by as much as 300%; an unprecedented 10 G (4140 pounds) of sustained static loading. CES, working with QinetiQ-NA proposes to advanc...

Phase 1 SBIR

Agency: Army
Topic: A11-061
Budget: 07/28/11 - 01/28/12

Creative Engineering Solutions, in collaboration with QinetiQ North America and its LAST armor solution, proposes to develop a switchable magnetic core element (SMCE) attachment system that breaks the traditional tradeoff of detachment time, isolation, pull strength, and weight which has been the limiting factor for all such state-of-the-art sys...