Echo Ridge, LLC

100 Carpenter Drive Array
Sterling, VA 20164
http://www.echoridgenet.com
12 Employees

SBIR Award Summary

Total Number of Awards 26
Total Value of Awards $9.24MM
First Award Date 07/03/07
Most Recent Award Date 03/16/16

Key Personnel

Last Name Name Awards Contact
Beck Mr. Andrew Beck 1 Message
Carlson John Carlson 25 Message
Kennedy Joseph Kennedy 5 Message
Kenedy Joseph Kenedy 0 Message

26 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF153-002
Budget: 03/16/16 - 06/20/17

ABSTRACT:Echo Ridge and subcontractor Rockwell Collins propose to build and test handheld prototypes of the Augmented Positioning System (APS) using previously developed components. APS will use highly abundant and globally available RF signals of opportunity (SoOPs) to provide error-growth-constrained position in GPS-challenged environments. ...

Phase 2 SBIR

Agency: Air Force
Topic: AF14-AT28
Budget: 02/23/16 - 04/30/18

ABSTRACT: Echo Ridge proposes to develop and deliver a suite of prototype EW training tools to support realistic warfighter training in the congested and contested RF environments expected in future operational engagements. The tools consist of an opposing force broadcast capability and an Electromagnetic Spectrum (EMS) monitoring capability whi...

Phase 2 STTR

Agency: Air Force
Topic: AF14-AT28
Budget: 02/23/16 - 04/30/18

ABSTRACT: Echo Ridge proposes to develop and deliver a suite of prototype EW training tools to support realistic warfighter training in the congested and contested RF environments expected in future operational engagements. The tools consist of an opposing force broadcast capability and an Electromagnetic Spectrum (EMS) monitoring capability whi...

Phase 1 STTR

Institution: George Mason University

Agency: Air Force
Topic: AF15-AT23
Budget: 07/20/15 - 04/18/16

ABSTRACT: Echo Ridge (ER) proposes to design an architecture and key algorithms to support spectrum sharing for PNT that focuses on spectrally congested and high likelihood operational scenarios. ?The architecture defines the new functionality/necessary improvements to the PNT elements (broadcasts satellite and MGUE DSA operation), spectrum sens...

Phase 1 STTR

Institution: Virginia Polytechnic Institute

Agency: Air Force
Topic: AF14-AT28
Budget: 09/29/14 - 06/29/15

ABSTRACT: Echo Ridge proposes to develop a suite of EW training tools to support realistic warfighter training in the congested and contested RF environments expected in future operational engagements. The tools consist of an opposing force broadcast capability, an EMS monitoring capability and an analytical framework for configuring and scorin...

Phase 1 SBIR

Agency: Air Force
Topic: AF141-107
Budget: 07/08/14 - 03/30/15

ABSTRACT: Echo Ridge and team partner AirIn Technologies propose to develop an innovative, low-cost satellite testing system which provides functionality of the TSTR and RBC TSTR electronics and is compatible with the AFSCN. The system will feature state of the art COTS (Commercial Off The Shelf) software-defined radio technology and high-speed...

Phase 1 SBIR

Agency: Air Force
Topic: AF141-100
Budget: 06/18/14 - 03/02/15

ABSTRACT: Echo Ridge and partner Rockwell Collins propose to quantify and demonstrate the value of existing tactical and commercial wireless communications signals in providing time aiding to MGUE. The primary results of the Phase I effort will be a comprehensive trade space analysis, off-air verification of absolute time-related statistics for...

Phase 2 SBIR

Agency: Air Force
Topic: AF121-063
Budget: 11/29/13 - 03/03/16

ABSTRACT: Echo Ridge proposes to prototype and evaluate GNSS processing algorithms designed to provide high accuracy and spoofing robustness (information assurance (IA)) by exploiting diversity in radio navigation signals (frequency, location, bandwidth, format) using new signal processing techniques. We will extend on-going work in the area of...

Phase 2 SBIR

Agency: Navy
Topic: N121-011
Budget: 07/03/13 - 07/15/15

Echo Ridge and partner Rockwell Collins propose to mature, enhance and further demonstrate the out the window (OTW)-synchronized RF environment emulator technology prototyped and demonstrated in Phase I. The Phase II design and development activities will result in a deliverable prototype system capable of demonstrating functionality, value, mit...

Phase 2 SBIR

Agency: Air Force
Topic: AF121-157
Budget: 04/30/13 - 04/29/15

ABSTRACT: Echo Ridge and George Mason University propose to mature, enhance and further demonstrate the PNT equipment hardware in the loop (HiTL) test asset successfully prototyped in Phase I. The risk reduction prototyping accomplished in Phase I illustrated how efficient and automatic testing of the effects of degraded position, navigation an...

Load More