Innovative Materials and Processes, LLC

8420 Blackbird Ct.
Rapid City, SD 57702
5 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $1.19MM
First Award Date 04/16/08
Most Recent Award Date 01/12/12

Key Personnel

Last Name Name Awards Contact
Swiatkiewicz Dr. Jacek J. Swiatkiewicz 2 Message
Doorenbos Zac Doorenbos 1 Message

3 Awards Won

Phase 2 SBIR

Agency: Army
Topic: A10-050
Budget: 01/12/12 - 01/12/14

The main objective of this proposal SBIR Phase II project is to scale-up and demonstrate the low-cost formation of 15-35 kg/yr of nanothermite-nitrocellulose composite granules for propellant ignition and as additives to explosive materials. All of the reactants used for the energetic composites will be made from United States produced materials...

Phase 2 SBIR

Agency: Army
Topic: N08-020
Budget: 09/25/09 - 09/24/11

Innovative Materials and Processes, LLC proposes to develop and demonstrate a high throughput mixing/metering.drying system to enable i) scale-up water-based production of Al-Bi2O3 superhtermite and ii) assembly of medium caliber electric primers using this superthermite material. The R&D project includes specific tasks: 1) optimization of elect...

Phase 1 SBIR

Agency: Navy
Topic: N08-020
Budget: 04/16/08 - 10/16/08

The proposed Phase I SBIR work is focused on development and testing of a continuous process for mixing of binary nanopowders in a micro-mixer system. The main focus will be on safe mixing of aluminum and bismuth trioxide or iron oxide nanopowders in water for their application as percussion primers or components of low energy initiators. The ...