Sysrand Corporation

15306 Foxglove Court
Parker, CO 80134
http://www.sysrand.com
3 Employees

SBIR Award Summary

Total Number of Awards 3
Total Value of Awards $949K
First Award Date 04/07/06
Most Recent Award Date 06/21/07

Key Personnel

Last Name Name Awards Contact
Rodriguez Mr. Gary J. Rodriguez 3 Message
Blair Bradley R. Blair 1 Message

3 Awards Won

Phase 2 SBIR

Agency: Air Force
Topic: AF06-261
Budget: 06/21/07 - 09/19/09

We offer a logistics-oriented marketing position, emphasizing mass production of satellite bus modules with rapid distribution to operational theatres. With declining costs single application satellites of short mission duration become a tactical alternative to large, multi-mission vehicles. We establish the classic build or buy decision in...

Phase 1 SBIR

Agency: National Aeronautics and Space Administration
Topic: 07-1
Budget: 01/01/07 - 12/31/07

The proposed innovation is a planetary surface tool called the Multi Purpose Excavation Demonstrator (MPED), which is intended to both extract Lunar Soil to feed an in-situ resource utilization (ISRU) processing plant, and to perform lunar civil engineering applications. The proposed MPED prototype is an excavation tool known as a 'bucket ladder...

Phase 1 SBIR

Agency: Air Force
Topic: AF06-261
Budget: 04/07/06 - 04/17/07

A few low-level changes in the USB2 implementation will enhance the performance of the serial bus in space applications. Several mid and upper-layer changes will considerably improve the utility and resulting system-wide synergism of the many components of a satellite. Seamless integration of distributed resources can enable response and relia...