Azure Summit Technology, Inc.

3050 Chain Bridge Road, Suite 600 Array
Fairfax, VA 22030
http://www.azuresummit.com
30 Employees

SBIR Award Summary

Total Number of Awards 37
Total Value of Awards $13MM
First Award Date 02/13/08
Most Recent Award Date 09/23/16

Key Personnel

Last Name Name Awards Contact
Sullivan Dr. Mark Sullivan 20 Message
Bierly Scott Bierly 7 Message
Schwarzwalder Joseph Schwarzwalder 1 Message
Schwarzwalder Joe Schwarzwalder 1 Message
Francis Scott Francis 2 Message
King Jim King 2 Message
Sullivan Mark Sullivan 1 Message
Francis Scot Francis 0 Message
Bierly Scot Bierly 0 Message
Whitacre Jennifer Whitacre 2 Message
Pearson Will Pearson 1 Message
Pearson Mr. William Pearson 3 Message
Whitacre Ms. Whitacre 1 Message
Whitacre Ms. Whitacre 1 Message
Whitacre Ms. Whitacre 1 Message
Whitacre Ms. Whitacre 1 Message

37 Awards Won

Phase 2 SBIR

Agency: Navy
Topic: N151-059
Budget: 09/23/16 - 09/23/18

The focus of this Phase II SBIR topic is to improve the electronic warfare (EW) and direction finding (DF) capability for submarines to meet the future Combatant Commands (COCOMs) Intelligence, Surveillance, and Reconnaissance (ISR) requirements.All COCOMs have identified EW and ISR improvements, to support Force Application and Battlespace Awar...

Phase 1 SBIR

Agency: Navy
Topic: N161-051
Budget: 08/01/16 - 01/28/17
PI: Jim King

For the US submarine force to continue operating in contested environments with increasingly capable radars, we need the capability to elude detection. One way is via countermeasures that deceive enemy radars into reporting incorrect target shape, range and velocity via a Digital Radio Frequency Memory (DRFM) jammer. In Phase I, we design a modu...

Phase 1 SBIR

Agency: Navy
Topic: N161-039
Budget: 07/29/16 - 01/25/17

We will show how smaller SWaP variants of our Switchblade Digital Tuner architecture can be developed and fielded within the specified SWaP constraints. This miniaturization of the Switchblade processing board to a smaller but as capable processing capability is possible due to leaps in FPGA and 3D integrated circuit technology. More importantly...

Phase 2 SBIR

Agency: Navy
Topic: N151-064
Budget: 07/28/16 - 12/31/18

The rapid proliferation of wireless communications protocols is accelerating the obsolescence of radio equipment. The RF environment is becoming more complex and increasingly crowded to meet the growing demand for wireless services. A failure of service providers to strictly adhere to common standards complicates matters further. The only way to...

Phase 2 SBIR

Agency: Navy
Topic: N141-065
Budget: 02/22/16 - 12/21/16

Azure Summit Technology, Inc. (Azure) will use the acquisition processor to process a wideband stream of RF spectrum to various computing nodes. This data can be provide to any processor and application based on the request. This architecture is in-line with the objectives of the future Navy EW system and the vision of PMS435 and PMA290. This wi...

Phase 1 SBIR

Agency: Navy
Topic: N151-059
Budget: 08/20/15 - 02/16/16

Azure's objective for this topic is to show how a variation of our small SWaP multi-channel spatial DF payload can be developed and fielded within the SWaP constraints of the mast to provide significant improvements to the existing DF capability as well as provide a roadmap for DF through the highest frequencies. This small SWaP payload wil...

Phase 1 SBIR

Agency: Navy
Topic: N151-064
Budget: 07/06/15 - 05/06/16

The rapid proliferation of wireless communications protocols is accelerating the obsolescence of radio equipment. The RF environment is becoming more complex and increasingly crowded to meet the growing demand for wireless services. A failure of service providers to strictly adhere to common standards complicates matters further. The only way to...

Phase 1 SBIR

Agency: Defense Advanced Research Projects Agency
Topic: SB151-005
Budget: 05/18/15 - 03/17/16

The proposed R&D effort develops techniques for collaborative communications for one-to-many, many-to-one, and many-to-many topologies. Measurements of the RF environment are shared to determine the best role for each node in the network-transmitter, receiver, or sensor. Collaboration provides an ability to extend range as well as an ability to ...

Phase 2 SBIR

Agency: Navy
Topic: N131-009
Budget: 08/12/14 - 03/31/15

In this Phase II SBIR research, Azure Summit will leverage substantial prior work and experience in small Size, Weight, and Power (SWaP) software defined radio and radar to create an important capability for a Sense and Avoid (SAA) radar for multiple platforms, including Triton and Fire Scout. Azure is working closely with RDRTec and NAVAIR to d...

Phase 1 SBIR

Agency: Air Force
Topic: AF141-253
Budget: 07/18/14 - 04/15/15

ABSTRACT: Azure Summit Technology,Inc. (Azure) will develop OmniNAV, a modular, open-architecture navigation receiver that derives PNT solutions from a wide variety of signals and sensors. Unlike today s military GPS receivers, OmniNAV software and firmware is field upgradable to deliver leading edge navigation technology to today s and tomorro...

Load More