Elcon, Inc.

1009 Timothy Drive
San Jose, CA 95133
http://www.elcon-inc.com
50 Employees

SBIR Award Summary

Total Number of Awards 8
Total Value of Awards $2.55MM
First Award Date 01/01/97
Most Recent Award Date 11/15/08

Key Personnel

Last Name Name Awards Contact
Barroco Mr. Anthony Barroco 1
W. Le Clair Mr. Robert W. Le Clair 2
Barraco Mr. Anthony J. Barraco 2
LeClair Robert W. LeClair 5 Message
Fong William A. Fong 3 Message
AhFong William AhFong 1 Message
Dayo Jesus E. Dayo 1 Message

8 Awards Won

Phase 1 SBIR

Agency: Defense Logistics Agency
Topic: DLA07-001
Budget: 11/15/08 - 11/15/09

Little manufacturing development has taken place in thermionic cathodes since the mid 1980s; current research efforts are focused on miniaturization of cathodes and an alternate technology, field emission, or cold, cathodes. With the exception of electron guns for commercial CRTs, there has been no concerted effort in standardization, volume ma...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2005
Budget: 01/01/05 - 12/31/05

75527S The sheet-beam klystron holds great promise for providing high RF power for modern linear colliders. However, sheet beam generation is not readily amenable to computer simulation; therefore, experimental validation of the design is sorely needed. This project will develop a demountable sheet beam analyzer with a fluorescent screen for ...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2004
Budget: 01/01/04 - 12/31/04

75527-The sheet beam klystron holds great promise for providing the high radio frequency power needed for modern linear colliders. However, sheet beam generation is not readily amenable to computer simulation; therefore, experimental validation of the design is sorely needed. This project will (1) fabricate a highly flexible, demountable sheet...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

60224 A family of traveling wave tubes (TWT), capable of outliving a 20-year accelerator, are being mated to power supplies to produce drive power for klystrons for the Next Linear Collider, at about one-tenth the cost of available commercial amplifiers. This project will develop S, X, and C-band TWTs with full specification performance. ...

Phase 2 SBIR

Agency: Department of Energy
Topic: 2001
Budget: 01/01/01 - 12/31/01

60224 A family of traveling wave tubes (TWT), capable of outliving a 20-year accelerator, are being mated to power supplies to produce drive power for klystrons for the Next Linear Collider, at about one-tenth the cost of available commercial amplifiers. This project will develop S, X, and C-band TWTs with full specification performance. ...

Phase 1 SBIR

Agency: Department of Energy
Topic: 2000
Budget: 01/01/00 - 12/31/00

Phase 2 SBIR

Agency: Department of Energy
Topic: 1998
Budget: 01/01/98 - 12/31/98

162

Phase 1 SBIR

Agency: Department of Energy
Topic: 1997
Budget: 01/01/97 - 12/31/97

162