Dynamic Positioning and Motion Control during Cargo Transfer Operations

Period of Performance: 08/01/2008 - 02/08/2009

$715K

Phase 2 SBIR

Recipient Firm

Craft Engineering Associates, Inc.
2102 48th Street
Hampton, VA 23661
Principal Investigator

Abstract

Detailed design, fabrication and installation of a modular column support structure to support the testing of the Hi-CASS crane concept.