Convertible Floating Dock

Period of Performance: 12/12/2000 - 12/31/2002

$1.65MM

Phase 2 SBIR

Recipient Firm

ART Anderson Assoc.
202 Pacific Avenue NW
Bremerton, WA 98337
Principal Investigator

Abstract

The goal of this project is to develop a modular dock system that is both commercially viable and militarily useful. The military requirements will be established by the JMLS Program. The design emphasis will be on maximizing the degree of standard components and subsystems, and thereby minimizing the number of unique subsystems, as much possible. The viability of the system will also be derived by optimizing the incorporation of commercially proven and new technologies, as much as possible.