Advanced thermal management materials and strategies for packaging high rate cylindrical cells and battery packs

Period of Performance: 08/14/2014 - 08/14/2016

$1000K

Phase 2 SBIR

Recipient Firm

Intramicron, Inc.
368 Industry Drive
Auburn, AL 36832
Principal Investigator

Abstract

Building on success in Phase I, this proposal focuses on the theoretical analysis, system level optimization, manufacturability, TRL progression and prototypic demonstration of IntraMicron's Enhanced Battery Pack (IEBP). IEBP facilitates rapid cooling of